In my television flipping laziness, I've noticed a show on MTV called Ridiculousness. I have no idea what this show is about. I've only seen it on the guide. But it could be about my kitchen.
Our air test came back moldy. Sooo. They're coming back to clean AGAIN tomorrow and then retest the air again on Wednesday, which means we'll have an answer on Friday at the earliest. Saturday will be 4 full weeks of no kitchen. Holy balls.
And guess what? It'll take at least three weeks to get cabinets built and installed. Once that's done, the countertop guy will come measure. Then it'll be another two weeks after that to get countertops, then three-ish days to install. At some point along the way, they have to repaint the dining room and kitchen, including the ceilings.
Bob and I have talked about a celebration dinner when all this is complete. We want to do a Thanksgiving-style meal, complete with a fried turkey. At this rate, it'll happen on effing Thanksgiving. Omg.